Parking Lot Currently Under Construction

parking lot 

10/4/2016

The front and back parking lots for the Perry Township Trustee's office located at 1010 S. Walnut Street are currently under construction. This means that parking around the Township office and food pantry, as well as the offices of New Leaf New Life and Area 10 Agency on Aging, is significantly restricted. If you need to visit one of these offices, you may need to find alternative parking, such as on Washington Street (one block east). This neighborhood does not have parking restrictions.

  back parking lot

 

Construction is expected to last through the end of 2016. The lot is being rebuilt because of flooding and drainage concerns. In the winter large portions of the parking lot get trapped under ice, and the plumbing system currently floods after every significant rainfall. The re-paving of the parking lot should fix these issues in the future. If you have questions about available parking around the Township office, you may call us at 812-336-3713.